Electro Industries Shark 200T Dokumentacja Strona 52

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 298
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 51
Doc# E149701 3 - 4
3: Mechanical Installation
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
2. Secure from back of panel with flat washer, lock washer and nut on each threaded
rod. Use a small wrench to tighten. Do not overtighten. The maximum installation
torque is 0.4 Newton-Meter.
Figure 3.5: ANSI Installation
3.3: DIN Installation Steps
1. Slide meter with NEMA 12 Mounting Gasket into panel (remove ANSI Studs, if in
place).
2. From back of panel, slide 2 DIN Mounting Brackets into grooves in top and bottom
of meter housing. Snap into place.
ANSI Installation
ANSI Studs
4.0” Round form
Przeglądanie stron 51
1 2 ... 47 48 49 50 51 52 53 54 55 56 57 ... 297 298

Komentarze do niniejszej Instrukcji

Brak uwag