4: Electrical Installation
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
4.3: CT Leads Pass Through (No Meter Termination)
The second method allows the CT wires to pass through the CT inputs without termi-
nating at the meter. In this case, remove the current gills and place the CT wire
directly through the CT opening. The opening accommodates up to 0.177” / 4.5mm
maximum diameter CT wire.
Figure 4.2: Pass Through Wire Electrical Connection